Step (3)
Leveling
Step (6)
Cleaning out the top trough
Step (2)
Setting Angle and Installing Legs
Step (1)
Unloading and
Transporting
Training Videos
Advanced Mining Equipment
Manufacturing and Sales of Prospecting Equipment
Step (4)
Connecting Hoses
Step (5)
Start Pump Start Shoveling
Step (7)
Cleaning out the lower trough
The window below plays the training video in its entirety. It is 11:00 minutes long. If you wish to go right to a select scene, use the links above.